Status report of the n_TOF facility after the 2nd CERN long shutdown period

Abstract During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility.The most important have been the replacement of the spallation target with Time and Space in Digital Game Storytelling a next generation nitrogen-cooled lead target.Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established.In this paper, the Factors Informing the Return of Adopted Dogs and Cats to an Animal Shelter core commissioning actions of the new installations are described.The improvement in the n_TOF infrastructure was accompanied by several detector development projects.

All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility.Furthermore, some indicative current and future measurements are briefly reported.

Leave a Reply

Your email address will not be published. Required fields are marked *